PSSR 2000

Instant hot water boiler

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PUWER

Hot water and system boiler

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PUWER

Heating system boiler

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PUWER

Cafe boiler

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Water tube boilers

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Loco boiler

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Multi-tubular boiler

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Horizontal air receiver

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Note: It is the receiver that dictates the status of PSSR. Not the compressor itself.

Vertical air receiver

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Note: Here there are several compressors all feeding the one air receiver. The "system" would all be incorporated within the required written scheme of examination.

Gas containers

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR

Air Conditioning plant

Inspection Frequency
As per WSE or Risk assessment
Related Regulation
PSSR
PUWER

Note: Air condition plant remains as a PUWER item unless it contains a vapour compression refrigeration system where the installed power exceeds 25 kW.

Back to top